FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION
through April 2, 1993, coarse coal refuse was hauled by 35ton trucks from the 500ton bin to the refuse pile. The dump trucks deposited piles of coarse refuse along the landside edge of the refuse pile. Bulldozers were used to spread the piles of coarse refuse and to push refuse over the pondside edge of the refuse pile. 25.